It/210 Application-Level Requirements

In: Computers and Technology

Submitted By bugger
Words 280
Pages 2
This is the ANSWER KEY for IT/210 Application-Level Requirements. BEWARE using these answers verbatim.

Application-Level Requirements List 1. The program shall present a series of user screens that prompts the user for specified input. 2. The main user screen shall have an application title. 3. The main user screen shall have a short description telling the user how to use the program. 4. The calculation of the currency shall be executed only after all valid input values are provided. 5. The program shall allow the user to clear all input fields and recomplete the calculation.

Input-Process-Output Chart
*** Input these values into the provided chart. Each Grouping of Input, Process, and Output represents One horizontal Row ***
Input
Name: Type: Range:
Process
Display Menu
Output
Name: Currency Type Type: Integer Range: 1-6

Input Name: International Value Type: Real Range: 0–1,000,000
Process
Get foreign value.
Output
Name: International Value Type: Real Range: 0–1,000,000

Input Name: International Value Type: Real Range: 0–1,000,000 Name: Currency Type Type: Integer Range: 1-6
Process
Convert Currency
Output
Name: US Value Type: Real Range: >0

Input Name: Currency Type Type: Integer Range: 1-6 Name: International Value Type: Real Range: 0–1,000,000 Name: US Value Type: Real Range: >0
Process
Display Results
Output
Name: Currency Type Type: Integer Range: 1-6 Name: International Value Type: Real Range: 0–1,000,000 Name: US Value Type: Real Range: >0

Hierarchy Chart
Complete a hierarchy chart for the application above by typing into the textboxes below.
*** The Top Box is "Currency Conversion" and the four below are "Display_Menu", "Get_Int_Value", "Convert_Currency", and…...

Similar Documents

Application

...Employment application form visa ASSISTANT & iNTERPRETER |1. Applicant Information | |Last Name |Rauf |First Name |Mustafayev |Other | | | | | | |names | | |Street Address |Azerbaijan, Sumgait city,mcrdis. 18, home 12, flat 4 | |Mobile Phone |055 2440090;050 3387288 |Home Phone |0186466211;0124156787 | |E-mail |briqada@bk.ru | |Position Applied for |Temporary Visa Assistant and Interpreter | |2. Education | |University of College |Course / Degree |Qualifications and grades obtained ......

Words: 478 - Pages: 2

Requirements

...Requirements The manufacturing plant that the author works for would benefit from complete barcode capabilities as stated in the author’s previous paper. This paper will explain the processes that are needed in to find requirements for new software. What is needed is to find out what a system requirement is by asking questions within the organization. According to Wright, “a system requirement is a property that is essential for an IT system to perform its functions” (Wright, 2007). I will explain these requirements by looking at three areas within the organization. First there is a business requirement, user requirements, and lastly functional requirements. Business Requirements Business requirements are described as the objectives of the business. This answers the questions as to why the company is taking on the project. “The requirements grow out of the vision for the product. This vision is driven by goals and objectives of the company. This is a long-term view of what the product can accomplish for the users and the company” (Gottesdiener, 2008). For instance as stated earlier L-3 receiving area needs a barcode capability for one it will help the department stay on top of shipments that come into the area. Second, it will also allow less mistakes and higher accuracy for inventory. Third, it will increase the staff’s accessibility to other jobs within the department. Last, it will help the customer. These are just a few examples on how it will help the......

Words: 712 - Pages: 3

Application

...PAS300 02/14 Application for a Uruwhenua Aotearoa New Zealand Passport USE THIS FORM if you are 16 years or over and: Adult Renewal your name has not changed since your last passport was issued, AND your passport has not been lost or stolen. Use the Adult form if you are 16 years or over and: you are applying for a New Zealand Passport for the first time; or your name has changed since your last passport was issued; or your passport has been lost or stolen. Our New Zealand Passport Our passport is valued and respected around the world for its integrity. We ask you to provide a range of information so that we can maintain its integrity by confirming your identity and entitlement to a New Zealand Passport. The New Zealand Passport is valid for a maximum period of 5 years. The validity period starts from the date of issue and runs until the date of expiry. This icon is used when you need to take extra care. The instructions with this icon will help you to understand whether you need to complete a particular section, or remind you not to miss out important details. What you need to complete this application Two (2) identical recent colour photos of yourself Someone to act as an identity referee who is over 16 years of age and has a valid New Zealand Passport The correct application fee How to contact us New Zealand: Freephone 0800 22 50 50 Phone +64 4 463 9360 Fax +64 4 382 3410 Australia: Freephone 1300 559 535 Phone +61 2 9225 2300 Fax +61 2 9223 0223......

Words: 4566 - Pages: 19

It 210

... | | |IT/205 Version 13 | | |Management of Information Systems | Copyright © 2014, 2012, 2011, 2009, 2008, 2007, 2006 by University of Phoenix. All rights reserved. Course Description This course introduces students to the world of information technology. Students will examine the technology concepts included in business systems, networking, and project management and explore the systems development life cycle. Specific topics for the course include hardware components, software applications, operating systems, databases, programming, as well as the security, privacy, and safety issues associated with information technology. Policies Faculty and students will be held responsible for understanding and adhering to all policies contained within the following two documents: • University policies: You must be logged into the student website to view this document. University policies are subject to change. Be sure to read the policies at the beginning of each class. Policies may be slightly different depending on the modality in which you attend class. If you have recently changed modalities, read the policies governing your current class modality. Course Materials Rainer, R. K., Jr., & Cegielski, C. G.......

Words: 2263 - Pages: 10

Requirements

...Computerized accounting Practice set (For Netsuite User) William T. Sucuahi INTRODUCTION Information is one of the vital resources of a company. The accounting department is the biggest contributor of this information in the entire enterprise. The information provider should provide timely and precise information to make good decisions. As computer applications became main stream, transforming data into information has gradually migrated into computerized spreadsheets. Gradually, accounting systems like Enterprise Resource Planning (ERP) integrates business process to provide user the best information they can use. The technological development today like the internet makes ERP became cloud-based and makes information available anytime and anywhere. Netsuite is one of leading cloud-based business management software provider in the world. Its mission is to provide companies around the globe, cloud-based, unified systems that deliver unprecedented capabilities to drive their business. It is a software as a service (SaaS) and it is available on demand. Below is general perspective of Netsuite business management system. The following are the key benefits of using Netsuite: • Comprehensive financials including accounting, budgeting, financial reporting and more • Get instant visibility into real-time financial and operational performance across your entire company • Streamline all back-office processes across financial management, revenue......

Words: 3959 - Pages: 16

Requirements

...Software Requirements. First, you have to understand what exactly software requirements are. The whole goal of the requirements phase in software development is being able to accurately decide what to build and then being able to document the result properly. All system requirements should be determined before the system design process. System design is the process where you come to the conclusion of which parts of the requirements will be designated to hardware and which to software. If you are not careful, you can easily run into a requirement problem. Not only are requirement problems continual they can be expensive. Requirements errors account for 70 percent to 85 percent of the rework costs on a software project (Wiegers 2003). In the article “Software requirements engineering: what, why, who, when and how”, “If one finds a requirements defect during the requirements phase and it costs one unit to fix (for example, three engineering hours, $500), the cost of fixing that same defect will typically increase as it is found later and later in the life cycle. In fact, studies show that it can cost more than 100 times more to fix a requirements defect if it is not found until after the software is released to the field” (Westfall 2006). The whole purpose of the requirements phase is to create and specify absolutely what the software is being built to do without detailing how to do it. As easy as this may sounds it at times still can be a tough task. Requirements......

Words: 959 - Pages: 4

Bus 210 Week 8-Checkpoint I It Applications Presentation

...BUS 210 Week 8-Checkpoint I IT Applications Presentation Get Tutorial by Clicking on the link below or Copy Paste Link in Your Browser http://hwguiders.com/downloads/bus-210-week-8-checkpoint-applications-presentation/ For More Courses and Exams use this form ( http://hwguiders.com/contact-us/ ) Feel Free to Search your Class through Our Product Categories or From Our Search Bar (http://hwguiders.com/ ) CheckPoint 1: IT Applications Presentation Resource: Ch. 9 of Introduction to Business Create a 5- to 7-slide Microsoft® PowerPoint® presentation to teach your fellow students about the following IT applications: Transaction processing systems Knowledge management systems Expert system and artificial intelligence Enterprise resource planning systems E-commerce systems Include detailed speaker notes and examples. Post your presentation as an attachment. BUS 210 Week 8-Checkpoint I IT Applications Presentation Get Tutorial by Clicking on the link below or Copy Paste Link in Your Browser http://hwguiders.com/downloads/bus-210-week-8-checkpoint-applications-presentation/ For More Courses and Exams use this form ( http://hwguiders.com/contact-us/ ) Feel Free to Search your Class through Our Product Categories or From Our Search Bar (http://hwguiders.com/ ) CheckPoint 1: IT Applications Presentation Resource: Ch. 9 of Introduction to Business Create a 5- to 7-slide Microsoft® PowerPoint® presentation to teach your fellow students about...

Words: 2414 - Pages: 10

It 210 Final

...IT/210 Final Project Currency Consolidation Requirements. Problem: Converting Currency A currency conversion application in a menu based system allowing users to select one of five set currencies to convert to and from the US dollar. The program will display the amount and will loop back to the beginning to allow another conversion or termination of the program. Currency Selections Canadian dollars (1US = 1.468 Canadian) Mexican pesos (1US = 9.5085 Pesos) English Pounds (1US = .66 Pounds) Japanese yen (1US = 104.92 yen) French francs (1US = 6.2561 Francs) Application-Level Requirements List 1. There should be a series of screens, in the application, that will help the user to input specified information. 2. Include general information and the title on the first screen 3. There should be explanatory material or external documentation. 4. Comments should be included in the program because this will allow other programmers to follow and track what has been done. 5. Should include the ability to clear the inputs and start the calculations over (just in case there are errors) Input process and output chart. INPUT | PROCESS | OUTPUT | Menu Options | Display Menu | Menu Options | Menu ChoiceCurrency | Get User Input | Menu choiceCurrency | CurrencyConversion formula | Convert Currency | Equivalent US dollar | Hierarchy Chart Main Module Main......

Words: 1021 - Pages: 5

It 210 Homework Absolute Tutors/It210Homework.Com

...IT 210 Entire Course FOR MORE CLASSES VISIT www.it210homework.com IT 210 Week 1 CheckPoint Input Data and Output Process IT 210 Week 1 DQ 1 and DQ 2 IT 210 Week 2 CheckPoint Software Development Activities Purposes IT 210 Week 2 CheckPoint Chapter 2 Programming Problem IT 210 Week 2 Assignment Application Level Requirements IT 210 Week 3 Che.. ******************************************************** IT 210 Week 1 CheckPoint Input Data and Output Process FOR MORE CLASSES VISIT www.it210homework.com 1. CheckPoint: Input Data and Output Process • Read the following scenario: You want to build a program that will keep track of your CD and DVD collection at home. • Use the table in Appendix C to complete this CheckPoint: o Identify at least three processes (capabilities) that are needed in order to keep track of your collection. o Identify the input data required for each of the processes. o Identify a logical name for each data output item and type of data output (real number, integer, text). • Post the table as an attachment. ******************************************************** IT 210 Week 1 DQ 1 and DQ 2 FOR MORE CLASSES VISIT www.it210homework.com 1. Discussion Questions • Why do you think the requirements analysis process is so difficult? Describe two things you can do to overcome these difficulties. • When building a house, a structured, modular approach is better than a......

Words: 359 - Pages: 2

It 210 Academic Success-Snaptutorial.Com

...IT 210 Entire Course For more classes visit www.snaptutorial.com IT 210 Week 1 CheckPoint Input Data and Output Process IT 210 Week 1 DQ 1 and DQ 2 IT 210 Week 2 CheckPoint Software Development Activities Purposes IT 210 Week 2 CheckPoint Chapter 2 Programming Problem IT 210 Week 2 Assignment Application Level Requirements IT 210 Week 3 CheckPoint Sequential and Selection Processing Control Structure IT 210 Week 3 DQ 1 and DQ 2 IT 210 Week 4 CheckPoint Iteration Control Structure IT 210 Week 4 Assignment Currency Conversion Design IT 210 Week 5 Checkpoint Simple Array Process IT 210 Week 5 DQ 1 and DQ 2 IT 210 Week 6 CheckPoint Algorithm Verification IT 210 Week 6 Assignment Currency Conversion Test Procedure IT 210 Week 7 CheckPoint Chapter 5 Programming Problems IT 210 Week 7 Exercise Peer Reviews of Currency Conversion Test Procedure Peer Review IT 210 week 7 DQ 1 and DQ 2 IT 210 Week 8 CheckPoint Interfaces and Communications Messages IT 210 Week 8 CheckPoint Object Oriented Data and Processes IT 210 Week 8 Assignment Object Oriented Design IT 210 Week 9 capstone DQ IT 210 Week 9 Final Project Currency Conversion -------------------------------------------------------------------- IT 210 Week 1 CheckPoint Input Data and Output Process For more classes visit www.snaptutorial.com 1. CheckPoint: Input Data and Output Process • Read the following scenario: You want to build a program that will keep track of your CD......

Words: 496 - Pages: 2

It 210 Homework Real Education / It210Homework.Com

...IT 210 Entire Course FOR MORE CLASSES VISIT www.it210homework.com IT 210 Week 1 CheckPoint Input Data and Output Process IT 210 Week 1 DQ 1 and DQ 2 IT 210 Week 2 CheckPoint Software Development Activities Purposes IT 210 Week 2 CheckPoint Chapter 2 Programming Problem IT 210 Week 2 Assignment Application Level Requirements IT 210 Week 3 CheckPoint Sequential and Selection Processing Control Structure IT 210 Week 3 DQ 1 and DQ 2 IT 210 Week 4 CheckPoint Iteration Control Structure IT 210 Week 4 Assignment Currency Conversion Design IT 210 Week 5 Checkpoint Simple Array Process IT 210 Week 5 DQ 1 and DQ 2 IT 210 Week 6 CheckPoint Algorithm Verification IT 210 Week 6 Assignment Currency Conversion Test Procedure IT 210 Week 7 CheckPoint Chapter 5 Programming Problems IT 210 Week 7 Exercise Peer Reviews of Currency Conversion Test Procedure Peer Review IT 210 week 7 DQ 1 and DQ 2 IT 210 Week 8 CheckPoint Interfaces and Communications Messages IT 210 Week 8 CheckPoint Object Oriented Data and Processes IT 210 Week 8 Assignment Object Oriented Design IT 210 Week 9 capstone DQ IT 210 Week 9 Final Project Currency Conversion ============================================== IT 210 Week 1 CheckPoint Input Data and Output Process FOR MORE CLASSES VISIT www.it210homework.com 1. CheckPoint: Input Data and Output Process • Read the following scenario: You want to build a program that will keep track of your CD and DVD collection at......

Words: 805 - Pages: 4

Requirement

...each group. Group leader is responsible for managing the group and to ensure that each member complete the task given. 3. Submission requirements: a) Font: Times New Roman, size 12 b) Spacing: 1.5 c) Please use the cover page template and include the group member’s declaration as per Appendix A 4. Marks will only be given to those whose names are on the assignment cover page. Please ensure that your name and student ID number are on it. Those whose names do not appear on the assignment cover page will automatically be assumed to have not submitted the assignment. 5. For group member that do not participate in the group assignment, the group leader has the right not to include his/her name in the assignment cover page. 6. Any act of plagiarism is a serious academic offence and you may get an F grade for your paper. SUBMISSION 1. Due date for this assignment is on Tuesday 10/05/2016 by 4.00 p.m at your lecturer’s office. 2. Late submissions will cause deduction of marks. GRADING 1. The lecturer will examine the thoroughness of your work and the presentation of your assignment i.e. content, format, grammar, etc. 2. The total marks for this assignment is contributed 15% towards the total grade of the course. Make sure you do it well. ASSGINMENT REQUIREMENT 1. You work as a financial analyst for a firm of international management consultants. A very large multimedia company has approached......

Words: 855 - Pages: 4

It 210 Homework Learn by Doing/It210Homework.Com

...IT 210 Entire Course FOR MORE CLASSES VISIT www.it210homework.com IT 210 Week 1 CheckPoint Input Data and Output Process IT 210 Week 1 DQ 1 and DQ 2 IT 210 Week 2 CheckPoint Software Development Activities Purposes IT 210 Week 2 CheckPoint Chapter 2 Programming Problem IT 210 Week 2 Assignment Application Level Requirements IT 210 Week 3 CheckPoint Sequential and Selection Processing Control Structure IT 210 Week 3 DQ 1 and DQ 2 IT 210 Week 4 CheckPoint Iteration Control Structure IT 210 Week 4 Assignment Currency Conversion Design IT 210 Week 5 Checkpoint Simple Array Process IT 210 Week 5 DQ 1 and DQ 2 IT 210 Week 6 CheckPoint Algorithm Verification IT 210 Week 6 Assignment Currency Conversion Test Procedure IT 210 Week 7 CheckPoint Chapter 5 Programming Problems IT 210 Week 7 Exercise Peer Reviews of Currency Conversion Test Procedure Peer Review IT 210 week 7 DQ 1 and DQ 2 IT 210 Week 8 CheckPoint Interfaces and Communications Messages IT 210 Week 8 CheckPoint Object Oriented Data and Processes IT 210 Week 8 Assignment Object Oriented Design IT 210 Week 9 capstone DQ IT 210 Week 9 Final Project Currency Conversion ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ IT 210 Week 1 CheckPoint Input Data and Output Process FOR MORE CLASSES VISIT www.it210homework.com 1. CheckPoint: Input Data and Output Process • Read the following scenario: You want to build a program that will keep track of your CD and DVD collection at......

Words: 805 - Pages: 4

Application

...554 0800 Fax: +44 (0)207 554 5136 www.CNoverseas.com www.ukuni.net University Application Service Agreement Party A: Party B: Date of Birth Day____ Month ____ Year_____ Overseas Student Service Centre Ltd. Service Agreement Reference Number: L000_______ ID/Passport Number: Sex: Email: Contact Telephone Number Male □ Female □ Current or most recent School: English Replacement Test Result: Correspondence Address: Party A agrees to perform the following services for party A:  To liaise with partner universities on behalf of Party B  To advise of educational opportunities  To provide university application forms in tangible or electronic form  To assist the completion of university application forms for the 3 universities selected by Party B  To liaise between the embassy and university on behalf of Party B  To provide basic advice on visa application  To preparing for university interviews if necessary  To assist Party B in accepting university offers  To arrange airport pickup  To assist arranging accommodation  To assist with university enrollment Party B agrees to provide the following for Party A:  A deposit of £100.00, to be returned after successful entry into a partner institution of Party A.  An administration fee of £50 for every extra university application (the first three applications are free)  True and accurate documents relating to their university application including academic certificates, identity documents and personal statements)......

Words: 772 - Pages: 4

Topic One: Hardware; Learning Level Two: Application/Analysis

...Level Two: Application/Analysis Memory management is dived into three areas and is mostly concerned with application memory management. Hardware: At this level is concerned with electronic devices that store data which includes the RAM and memory cache. Application: This involves supplying memory needed for data structures and program objects from limited resources thus allowing for recycling of the memory to be reused when no longer required. Application programs cannot predict in advance how much memory it will require so additional code is needed to handle the memory chances. Two tasks done by application * Recycling: Memory blocks have been allocated, the data contained is no longer required by a program, the blocks are recycled for reuse. Memory can be recycled when the programmer decides what memory need reuse known as manual or the memory manger decides known as automatic. * Allocation: When a program requests a block of memory, that block of memory is allocated out of lager blocks received from the operating system. This is all done by the allocator. Constraints done by application * Interactive pause time: The delay and interactive user observes. * CPU overhead: Time taken while a program is running. * Memory overhead: Wasted space by poor layout or known as external fragmentation, administration or rounding or known as internal fragmentation. Operating System: Memory is allocated to user programs and reused...

Words: 257 - Pages: 2