Re: Case Study Memorandum

Subject: Roger Boisjoly and the Challenger Disaster: Disloyal Employee or Courageous Whistle-Blower?

Facts: The focus of this case study is on Roger Boisjoly's attempt to avert the launch of the Challenger and his act of employee loyalty to set the record straight despite the negative outcome. Boisjoly was employed with Morton Thiokol Inc. as an engineer and an expert in rockets. During an examination of the Challenger (STS 61-C), Biosjoly and the Seal Erosion Task Force discovered a problem with the hot-gas blowby or ignited fuel which came from joint leaks and the O-ring convincing the team that it was not safe to launch until the problem was fixed. Boisjoly notified his boss in writing of what was found. Despite what Boisjoly informed his boss, NASA went ahead and did the launch. Predictions came true when a catastrophic explosion resulted from the failed O-ring seals and the Challenger and the crew was lost. President Reagan appointed a commission to look into the devastation and found that the interviews given by senior management of Morton Thiokol and Boisjoly and a fellow engineer contradicted eachother which lead Boisjoly to believe that senior management was trying to cover up what had happened. Boisjoly and his fellow coworker were reprimanded for telling the truth about what really happened. Eventually, Boisjoly resigned from his position due to psychological strain and a hostile working environment.

Ethical Issues: Disloyal Whistle Blowing Employee is how Biosjoly is being identified by Morton Thiokol Inc. As soon as the problem was identified, Biosjoly felt that it was his duty to report it. And being that he reported it to his boss (the agent to the company), it was the boss’ duty to ensure that the proper precautions were taken to eliminate anything catastrophic from happening.

Alternatives:…...

Similar Documents

Roger Boisjoly and the Challenger Disaster Case Study Memo

...Re: Case Study Memorandum Subject: Roger Boisjoly and the Challenger Disaster: Disloyal Employee or Courageous Whistle-Blower? Facts: The focus of this case study is on Roger Boisjoly's attempt to avert the launch of the Challenger and his act of employee loyalty to set the record straight despite the negative outcome. Boisjoly was employed with Morton Thiokol Inc. as an engineer and an expert in rockets. During an examination of the Challenger (STS 61-C), Biosjoly and the Seal Erosion Task Force discovered a problem with the hot-gas blowby or ignited fuel which came from joint leaks and the O-ring convincing the team that it was not safe to launch until the problem was fixed. Boisjoly notified his boss in writing of what was found. Despite what Boisjoly informed his boss, NASA went ahead and did the launch. Predictions came true when a catastrophic explosion resulted from the failed O-ring seals and the Challenger and the crew was lost. President Reagan appointed a commission to look into the devastation and found that the interviews given by senior management of Morton Thiokol and Boisjoly and a fellow engineer contradicted eachother which lead Boisjoly to believe that senior management was trying to cover up what had happened. Boisjoly and his fellow coworker were reprimanded for telling the truth about what really happened. Eventually, Boisjoly resigned from his position due to psychological strain and a hostile working environment. Ethical......

Words: 521 - Pages: 3

Roger Boisjoly and the Challenger Disaster Case Study Memo

...Roger Boisjoly and the Challenger Disaster Case Study Memo Re: Case Study Memorandum Subject: Roger Boisjoly and the Challenger Disaster: Disloyal Employee or Courageous Whistle-Blower? Facts: The focus of this case study is on Roger Boisjoly's attempt to avert the launch of the Challenger and his act of employee loyalty to set the record straight despite the negative outcome. Boisjoly was employed with Morton Thiokol Inc. as an engineer and an expert in rockets. During an examination of the Challenger (STS 61-C), Biosjoly and the Seal Erosion Task Force discovered a problem with the hot-gas blowby or ignited fuel which came from joint leaks and the O-ring convincing the team that it was not safe to launch until the problem was fixed. Boisjoly notified his boss in writing of what was found. Despite what Boisjoly informed his boss, NASA went ahead and did the launch. Predictions came true when a catastrophic explosion resulted from the failed O-ring seals and the Challenger and the crew was lost. President Reagan appointed a commission to look into the devastation and found that the interviews given by senior management of Morton Thiokol and Boisjoly and a fellow engineer contradicted eachother which lead Boisjoly to believe that senior management was trying to cover up what had happened. Boisjoly and his fellow coworker were reprimanded for telling the truth about what really happened. Eventually, Boisjoly resigned from his position due to......

Words: 314 - Pages: 2

Case 5. Roger Boisjoly and the Challenger Disaster: Disloyal Employee or Courageous Whistle-Blower?

...1- Abdulla Abdulrahman U00018181 2- Mohammad HHH U00018254 3- Majid Ahmed U00014400 4- Saud Al Qassimi U00018888 5- Abdulla Al-nuaimi U00031505 Introduction:- In the business world, communication is a major thing. And this communication is traded in the form of messages. Messages can be oral or non-oral like written and typed messages. There are two types of messages, first is positive and the second is negative. In our project we are going to talk about the second type which is the negative messages. We are not only going to talk about the negative messages itself. We will talk about the strategies of delivering bad or negative news. Besides, we will give some solutions and methods to make the bad news seem good or accepted. What is the negative messages ? What are the strategies or plans to deliver the negative news or messages? What is the direct plan and the indirect plan and when should we use one of them ? And, how to deliver a bad news ? All of these wonderings and questions will be answered and clarified in this report. “ To be agreeable while disagreeing – that’s an art “ Malcolm Forbes Negative Messages:- Negative message is delivering bad news or any message to which the reader and listener or any type of receivers will have an unpleasant emotional reaction. A message is classified as negative when: * The main point is negative. * The receiver will be disappointed or angry. Besides,...

Words: 730 - Pages: 3

Challenger Case Study

...decision making process? The Challenger Launch decision on January 28th 1986, proved to be one of the crucial decisions ever made as it lead to one of space science's most talked about disasters. The Challenger launch project was faced by a major financial constraint owing to the ongoing Vietnam War. Thiokol won the contract to build the SRBs since they asked for a lower emolument that their competitors and also provided an innovative modular design for the SRBs that would ease the transportation. There were many reasons NASA was pressured to launch, one being the need to launch the 51L space shutter without any delays so the launch pad could be restored in time for the next mission. Also, any delay in the mission would only result in negative publicity through the media. Under such pressurised circumstances, NASA and Thiokol could not look in the right direction and lacked consensus. So, communication breakdown was perhaps the major contributor in the decision making process here. It is evident that Thiokol was not prepared for the Teleconference since it did not have all the necessary statistical inputs required to arrive at a conclusion. This lead to an internal communication failure within Thiokol. The primary factor for such a communication failure was the lack of structured data and no proper way of seeking the data. Apart from this there was NASA and Thiokol were not on the same side and there was a continuous argument between Roger Boisjoly (The Booster seal......

Words: 1338 - Pages: 6

Bhopal Disaster Case Study

...lists are prima facie duties, means each one is to choose the most important duty that overrides it. In some cases the duties can be given an absolute priority. For example, preservation of human life is more important than cultivation of the life of the mind After the tragedy, the Union Carbide company did not provide any information indicating that the gas contains these chemicals to the hospital , so the doctor just can help the patient with the basic emergency rescue(C Sathyamala2012). 2. Definitely no. Although the standard of living in Indian are lower than the standard of living in US, but for sure have to treat everyone impartial not due to the geographical issues. Because this is the human right for the victims in Indian. They deserve to receive the equal amount of the compensation regardless of the economic circumstances. Moreover , Union Carbide are applying the egoism in these scenario .They had made compensation payments of several hundred million dollars but there remain many more claimants for compensation , hence Union Carbide wanted to settle down this case as soon as possible. 3. It is egoism that Union Carbide USA have been given for its use of Forum non convenient. Once the amount paid previously for Union Carbide about all criminal and civil charges will be canceled out in the future and the Court will no longer accept complaints about the case. If India maintains its original request, the lawsuit can go until the next century. Delay......

Words: 787 - Pages: 4

Walmart Case Study Memo

...Memorandum RE: Wal-mart Case Study DATE: April 15, 2013 ******** The key source of Wal-Mart’s success through 1994 was their ability to optimize and be innovative in the area of technology. Wal-Mart not only exceeded their competitors in the amount they invested in technology - which was over $700 million from 1987 to 1994 - but was also well ahead of their competitors in the use of technology to reduce expenses. Through the use of technology, Wal-Mart was able to manage their company’s inventories more efficiently within their warehouses while also enabling them to utilize the assets of their suppliers. Wal-Mart’s inventory and sales data were tracked via UPC codes. This “tracking technology” allowed them to ensure accurate pricing, improve efficiency by the utilization of shelf pricing versus price tags (which was still being used by their competitors), along with the ability to identify inventory that was stolen from one store and attempted to be returned to another. With this cutting edge technology, combined with the installation of a satellite system, Wal-Mart had greater communication between stores, improving inventory control, resulting in reduced overstocks and inventory shrinkage, while allowing them to also track the daily results across all of their stores. Wal-Mart’s distribution network also benefitted from the investment in this satellite system. For example, when a consumer purchased an item such as a bottle of Just for Men’s......

Words: 537 - Pages: 3

The Challenger Disaster

...The Challenger Disaster: And My Interpretation of the Ethical Flaws The Challenger disaster was not only a disaster in terms of the destruction of the spacecraft and the death of its crew but also in terms of the decision-making process that led to the launch of the investigation into the "causes" of the disaster. The decision to recommend for launch was made by lower-level management officials over the objections of technical experts who opposed the launch under the environmental conditions that existed on the launch pad at the time. Furthermore, the lower-level managers who made this decision both NASA and contractor personnel, chose not to report the objections of the technical experts in their recommendations to higher levels in the management chain- of-command to proceed with the launch. Finally, it seems that the lower-level managers had also received out-of-the-ordinary pressure from higher levels of management to proceed with the launch on time. The investigation began with an effort to determine the technical causes of the explosion of the Challenger. Initially, the decision-making process leading to the launch was not considered by investigators. This suggests that the initial purpose of the investigation was not concerned with ethical issues or issues of responsibility. As the investigation proceeded information appeared that suggested that NASA had been aware of the risk of explosion under the environmental conditions that existed for the......

Words: 1074 - Pages: 5

Challenger Disaster

...Challenger case study analysis Facts 1. Space shuttle challenger disaster leads to the death of its crew members 7. 2. NASA’S organizational culture and decision making process is a key contributing factor of the accident. 3. NASA managers had known contractor Morton Thiokol’s design of the SRB contained a potentially catastrophic flaw in the o-rings since 1977. 4. NASA disregarded warnings from engineers about the dangers of launching posted by the low temperature of that morning. 5. The ROGER”S commission offered NASA 9 recommendations that were to be implemented before shuttle flight resumed. 6. The o-rings had no test data to support any expectation of successful launch in such conditions. 7. Challenger was originally set to launch from Kennedy space center in Florida at 2:42 EST Jan 22. 8. Launch was delayed 1st to Jan 23 then 2nd to Jan 24, 3rd to Jan 25 due the bad weather at the TAL site in Senegal. NASA decided to use Casablanca as TAL site but it wasn’t equipped for night landings so they had to move it to the morning to Florida. 4th to Jan 27 9:37 as of unaccepted weather at Kennedy space center and5th to Jan 28 as by problems with the exterior access hatch. 9. Delayed 5 times shows lack of good decision making and management of NASA’s managers. 10. Morton Thiokol is the contractor responsible for the construction and maintenance of the shuttle’s SRBs. 11. Rockwell international is the shuttle’s prime contractor. ...

Words: 1586 - Pages: 7

Challenger Catastrophy

...The Space Shuttle Challenger Disaster was a preventable disaster that NASA tried to cover up by calling it a mysterious accident. However, two men had the courage to bring the real true story to the eyes of the public and it is to Richard Cook and Roger Boisjoly to whom we are thankful. Many lessons can be learned from this disaster to help prevent further disasters and to improve on organizations ethics. One of the many key topics behind the Challenger disaster is the organizational culture. One of the aspects of an organizational culture is the observable culture of an organization that is what one sees and hears when walking around an organization. There are four parts to the observable culture, stories, heroes, rites and rituals and symbols. The first one is stories, which is tales told among an organization’s members. In the Challenger Space Shuttle incident there were mainly four organizations thrown together to form one, Morton Thiokol, Marshall Space Flight Center, Johnson Space Center and NASA Headquarters. All of these organizations had the same type of stories to be told. At Morton Thiokol, they talked about their product and their big deal, which they received from NASA. At NASA, it’s members retold stories of the previous space missions and being the first people to have landed on the moon. Second are their heroes. At Morton Thiokol, their heroes might have been the founders of the organization or it’s top executives like Charles Locke or Jerry Mason. At NASA,......

Words: 2909 - Pages: 12

Challenger Disaster

...when assessing the erosion and blow by incidents, they likely would have come to a different conclusion when they decided to launch the Challenger shuttle. 10. Which risks should be elevated? To whom should they be elevated? Who should have the final say in the response mechanism for a risk? All risks should be elevated to whatever level of responsibility are related to the task or component the risk is assigned to. For example, lower level risks should be assigned to lower level management and the critical risks, as described in exhibit V, should be the responsibility of the program manager and the NASA administrator. It's also important to note that for the risks involved in space travel, the astronauts on the flight should also be aware of the assumed risks that are taking place during the development of the space shuttle. One of the issues that NASA faced during the space shuttle development is that risks weren’t assigned to a specific level of authority. No one person had the responsibility for saying yes or no to a specific risk, rather it was done in a “group think” environment. 11. What response mechanism was used when waivers were used? What about when they ignored the engineer’s recommendation? In order to reduce paperwork, NASA utilized a waiver system. This system was in place decades before the Challenger disaster. It allowed project managers and contract administrators the authority to bypass standard protocol in order to save time.......

Words: 1112 - Pages: 5

Case Study Memo

...Mr. Speed Alzheimer’s Case Study Erica Boozer HCS/245 January 7, 2015 Lisa Spencer Mr. Speed Alzheimer’s Case Study My name is Dr. Boozer. This is the case study of Mr. Speed and the condition of his Alzheimer disease. This memo will cover Alzheimer disease as a whole and resources of where more information about the disease can be found. This memo will also discuss any cultural issues that Mr. Speed may face having the disease and the impact Alzheimer’s has on society and its resources. Alzheimer’s is a disease that effects the central nervous system. According the livestrong.com, the loss of functioning brain tissue that occurs with Alzheimer disease initially causes problems with memory and learning. Personality, intellectual function and mood are greatly affected as the disease progresses. As Mr. Speed get in the later stages of the disease, it should be expected that he will lose his sense of self and present things that are going on around him (livestrong.com, 2015). In the early stages of this disease, Mr. Speed may not need any assistance with day to day activities. However as it progresses to where he experiences memory loss or trouble doing simple task such as paying bills, he may require some type of supervision (alz.org, 2015). More information such as symptoms, other systems of the body that Alzheimer’s may effect or what to expect in the different stages of this disease can be found on livestrong.com and alz.org. Alzheimer effects all races and......

Words: 567 - Pages: 3

Case Study - It Horror Disaster

...CASE PREPARATION CHART Student Name | LOO LIAN VEE | Student ID | 1112700203 | Submission date | 20 APRIL 2016 | Case title | THE GREAT IT HORROR STORY | Section | AC 02 | ------------------------------------------------- ------------------------------------------------- ASSESSMENT To be filled by facilitator Components | Scores | Scores | | 1 mark | 2 marks | 3 marks | 4 marks | | Completeness of case chart | Case chart is incomplete | Some of the case chart requirements are met satisfactorily. | Most of the case chart requirements are met satisfactorily. | All case chart requirements is met satisfactorily. | | Submission | On-time submission | N/A | N/A | N/A | | TOTAL | | Synopsis This story of Craven Books tells us about how a computer project, an IT implementation drove one company almost to bankruptcy. Craven Books is a distributor of comics and magazines, and books. The company was founded in 1960 by Peter Craven as he started to distribute sci-fi and horror books through direct mail. In 1970s, the business began well known in the marketplace by buying comics in bulk from both the American publishers and the second hand comic market and sell this on their customers in the United Kingdom by using a mail order catalogue. In the 1990s, the company was at the peak of it success and was looking to expand their business; to do so, it was decided the company should have an efficient distribution system, and that’s why Craven......

Words: 2413 - Pages: 10

Challenger

...October 14, 2015 OSCM 3322 Midterm Challenger Disaster On the morning launch of the challenger on January 28th, 1986, at approximately 9:41am an unexpected event happened. The shuttle, within 75 seconds of taking off, exploded in the air. Citizens and NASA staff were shocked and confused as to what they had just seen, but there was a small group knew this type of problem could occur. They had little evidence but still chose to launch that day, now worrying about the events that will transpire thereon. Many questions as to why the shuttle had exploded arose such as, “What caused it to malfunction?” “Was there any known facts before the incident?” And if so, “why was there no action taken?” Unfortunately, some of these questions were addressed and brought to a few personnel in top management positions such as managers, vice presidents, supervisors, and engineers. One of the main issues was the failure to communicate the problem of the O-rings in a timely manner. The fact that they waited until the night before the launch to discuss the problems that the seals were causing, was an obvious point leading us to believe that the organization of communication within the chain of command was faulty. Another issue was that Larry Mulloy saw the data that Roger Boisjoly and Arnold Thompson provided, lacked details to support their theories. In all retrospect, they were the ones who had done the research and work that lead them to their conclusions. It was obvious that they knew...

Words: 806 - Pages: 4

The Space Shuttle Challengeri Disaster

...The Space Shuttle Challenger Disaster I On January 28,1986, the space shuttle Challenger lifted off the launch pad at 1 1:38 A.M., beginning the flight of mission 51-L.' Approximately seventy-four seconds into the flight, the Challenger was engulfed in an explosive burn and all comrnunication and telemetry ceased. Seven brave crewmembers lost their lives. On board the Challenger were Francis R. (Dick) Scobee (commander), Michael John Smith (pilot), Ellison S. Onizuka (mission specialist one), Judith Arlene Resnik (mission specialist two), Ronald Erwin McNair (mission specialist three), S. Christa McAuliffe (payload specialist one), and Gregory Bruce Jarvis (payload specialist two). A faulty seal, or O-ring, on one of the two solid rocket boosters caused the accident. Following the accident, significant energy was expended trying to ascertain whether the accident had been predictable. Controversy arose from the desire to assign, or to avoid, blame. Some publications called it a management failure, specifically in risk management, while others called it a technical failure. Whenever accidents had occurred in the past at the National Aeronautics and Space Administration (NASA), an internal investigation team had been formed. 'The first digit indicates the fiscal year of the launch (i.e., "5" means 1985). The second number indicates the launch site (i.e., "1" is the Kennedy Space Center in Florida, "2" is Vandenberg Air Force Base in California). The letter......

Words: 20302 - Pages: 82

Case Study- Conference Room Disaster

...Conference Room Disaster Case Study Analysis Assuming the day would have been a typical and normal working day was a complete incorrect assumption as the meeting in a crowded conference room is cancelled due to the ceiling giving way to a water leakage, flooding the working papers and electronics that were on the conference room table. Staff members rushed out into the dry hallways leaving the working papers and electronics on the conference room table to be drenched with water. The working papers are most possibly facing complete turmoil of the data that was to be discussed and the electronic equipment’s could be substantially damaged by the water flood. Many thoughts came to my mind such as did anyone save the documents on an external storage drive? Or, did anyone from maintenance perform a routine maintenance check of the water plumbing in the building? And, did the company leaders ever implement some sort of a Disaster Recovery Plan (DRP) for when such disasters occur in working environments that encompass physical and intangible working documents and data? All these questions flooded my mind more than I could imagine the water to have flooded the conference room. These questions resulted from the problems that occurred and each problem that we faced could have had higher severity in damages. The problems that were incurred were due to prior problems that were built upon newer problems. The first problem that I thought of that could have existed was the routine......

Words: 731 - Pages: 3