12‐week study plan
Week 1 – PMR
Week 2 – PMR
Week 3 – Assurance
Week 4 – Week of review of previously covered material
Week 5 – Assurance
Week 6 – MDM Part
Week 7 – Finance ; PMR
Week 8 – Week of review of previously covered material
Week 9 – Taxation
Week 10 – Write and debrief Mock Exam #1
Week 11 – GSRM; PMR
Week 12 – Write and debrief Mock Exam #2 and #3

Management Decision MakingPart 1 Intro 55 minPart 2 Various subjects 62 minPart 3 Various subjects 41 minPart 4 Information Technology 42 minPart 5 Various subjects 36 minPart 6 Various subjects 56 min | FinancePart 1 Intro and various subjects 43 minPart 2 Various subjects 62 minPart 3 Various subjects 50 minPart 4 Various subjects 72 min | TaxationPart 1 Intro 67 minPart 2 Various subjects 65 minPart 3 Various subjects 77 minPart 4 Various subjects 58 minPart 5 Various subjects 42 minPart 6 Various subjects 35 min | GSRMGovernance, strategy and risk management is a short 45 minute lecture with 18 embedded multiple choice questions. There is approximately 1.5 hours of learning time in the GSRM area. | PMRPMR 1 Intro 5 minPMR 2 Conceptual Framework 12 minPMR 3 FS Presentation 12 minPMR 4 Statement of Cash flows 36 minPMR 5 Revenue 52 minPMR 6 Accounts Receivable 13 minPMR 7 Notes Receivable 21 minPMR 8 Inventories 34 minPMR 9 Property, Plant and Equipment 65 minPMR 10 Borrowing Costs 12 minPMR 11 Intangible Assets 32 minPMR 12 Impairment of Assets 25 minPMR 13 Investment Property 13 minPMR 14 Agriculture 9 minPMR 15 Non-Current Assets Held for Sale 17 minPMR 16 Liabilities and Contingencies 48 minPMR 17 Shareholder’s Equity 25 minPMR 18 Employee Benefits 58 minPMR 19 Leases 51 minPMR 20 Income Taxes 80 minPMR 21 Accounting Policies 23 minPMR 22 Events After the Reporting Period 5 minPMR 23 Government Grants 15 minPMR 24 Related Party Transactions 12 minPMR 25 Earnings Per Share…...

Similar Documents

Sample

...SAMPLE FORMAT FOR INTERNSHIP COVER LETTERS (Top and bottom margins should be approximately equal) Date Your Street Address City, State, Zip Ms. Sandra Jones, Director Marketing Division American Industrial Corporation 1111 American Avenue America, IL 60006 Dear Ms. Jones: Opening Paragraph: State why you are writing, identify the internship position for which you would like to be considered, and indicate how you heard of the position. Mention any individuals who may have referred you to the position. If you are sending an inquiry letter, simply indicate the type of work or position you are seeking. Be specific. Middle Paragraph(s): Your goal here is to show how you can be useful to this particular organization. Describe what strengths you have to offer this employer. Highlight particular classes, jobs, internships, achievements, and extracurricular activities as they relate to the position in which you are interested. You might want to use one of the following approaches: Identify three reasons for the employer to consider you for the position. Describe your previous accomplishments as they relate to the position. Illustrate the relationship between your skills and experience and the position you are applying for. State why you want to work for their organization. Refer the reader to your enclosed resume for additional information. Closing Paragraph: End your letter by clarifying what will happen next, indicating your desire for an interview, and how they can most easily......

Words: 779 - Pages: 4

Sample

...nursing care plans and discharge planning.  | |As an assistant nurse manager, I maintained a well-oiled floor, in charge of staff | |schedules, performance monitoring. As a manager / mentor, I ensured my staff nurses used both critical | |thinking and technical skills at all times to ensure the delivery of competent patient care, exercising | |strong observation, assessment, intervention, and reporting skills.  | |  | |I would like to join your nursing staff. For this reason, I hope to speak with you soon to learn about a | |position at your hospital. | |  | |Sincerely, | | | http://www.letters.org/cover-letter/assistant-director-nursing-cover-letter.html Sample Cover letter for Assistant Director Nursing Good cover letter is all about mentioning your skills in short and simple language which catches the attention of employer. Applying for Assistant Director......

Words: 611 - Pages: 3

Schedule

... | | | |Service Request | | | | |SR-kf-013 Paper |Preliminary design model: Provide a diagram that illustrates the overall logical information | | | |(Preparation) |architecture. | | | | | | | | | |Design trade-off approach: Specify the tradeoffs among cost, schedule, and performance. For | | | | |example, a fast, inexpensive solution may not address performance requirements adequately. | | | | | | | | | |Detailed design process and design specifications: Specify separate recommended decisions for | | | | |software design, hardware, and networks. Include resolution of HCI considerations. | | | | | ...

Words: 2417 - Pages: 10

Schedule 6

...GUIDANCE NOTE ON THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956 The Institute of Chartered Accountants of India (Set up by an Act of Parliament) New Delhi © THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form, or by any means, electronic mechanical, photocopying, recording, or otherwise, without prior permission, in writing, from the publisher. Edition Committee/Department Email Website Price ISBN Published by : : : : : : : December, 2011 Corporate Laws & Corporate Governance clcgc@icai.org www.icai.org ` 200/978-81-8441-499-8 The Publication Department on behalf of the Institute of Chartered Accountants of India, ICAI Bhawan, Post Box No. 7100, Indraprastha Marg, New Delhi - 110 002. Sahitya Bhawan Publications, Hospital Road, Agra 282 003 December/2011/5,000 Copies Printed by : Foreword The Ministry of Corporate Affairs of the Government of India has been taking many initiatives for overhauling the Companies Act, 1956 through major amendments, circulars and notifications. To make Indian business and companies competitive and globally recognisable, a need was felt that format of Financial Statements of Indian corporates should be comparable with international format. Since most of the Indian Accounting Standards are being made at par with the international Accounting Standards, the changes to format of Financial Statements to align......

Words: 52030 - Pages: 209

Nfl Schedule

...998 Washington Redskins schedule (April 1, 1998) — Listed below is the official 1998 schedule for the Washington Redskins. All times are local and all games are on Sunday, unless otherwise noted. REDSKINS 1998 PRESEASON SCHEDULE DATE OPPONENT TIME AUG. 8 MIAMI (Sat.) L16-19 AUG. 15 at Tennessee (Sat.) W27-24 AUG. 22 NEW ENGLAND (Sat.) L 17-20 AUG. 28 at Buffalo (Fri.) L17-27 REDSKINS 1998 REGULAR-SEASON SCHEDULE DATE OPPONENT TIME SEP. 6 at New York Giants 1:01p SEP. 14 SAN FRANCISCO (Mon.) ...

Words: 350 - Pages: 2

Schedule

...UTAR PERAK CAMPUS BUS SCHEDULE Monday to Friday Trip (May Trimester 2010) Effective from 24 June 2010 until further notice Bus 5 – BHX 7347 Bus Stop (In front of CK Optical Shop) Kampar Railway Station Taman Bandar Baru Selatan (In front of Plaza Impiana) Arrival/ Departure 8.45 am 1.10 pm 1.40 pm 1.43 pm 1.15 pm 1.20 pm 1.25 pm 1.53 pm 1.55 pm 1.58 pm Time Leaving UTAR No Pangsapuri Sutera Apartment Jalan Kolej Kampar Bus Station Time Arriving UTAR 2 4 6 Block D 7.50 am 10.15 am 12.37 pm Block B 10.18 am 12.40 pm 10.30 am 12.55 pm 1.45 pm 8.35 am 10.32 am 8.38 am 10.35 am Arrival 8.05 am Departure 8.10 am Arrival 8.15 am Departure 8.20 am Block B 8.55 am 10.45 am Block D 8.58 am 10.48 am Block G 10.50 am 7 9 10 11 3.15 pm 5.32 pm 7.15 pm 8.15 pm 3.18 pm 5.35 pm 7.18 pm 8.18 pm 3.28 pm 5.50 pm 7.28 pm 8.28 pm 3.30 pm 5.52 pm 6.35 pm 7.30 pm 8.30 pm 3.33 pm 5.55 pm 6.38 pm 7.33 pm 8.33 pm 3.40 pm 6.05 pm 6.10 pm 6.15 pm 6.20 pm 3.50 pm 6.48 pm 7.43 pm 8.50 pm 3.53 pm 6.51 pm 7.45 pm 8.53 pm 3.55 pm 8.40 pm Time Leaving UTAR No. 1 3 5 8 Block D 7.15 am 9.35 am 11.40 am 4.40 pm Block B 9.38 am 11.43 am 4.43 pm Bus Stop 1 (Arrival) 7.22 am 9.45 am 11.50 am 4.50 pm Westlake Home Bus Stop 2 (Arrival) 7.27 am 9.50 am 11.55 am 4.55 pm Bus Stop3 (Arrival) 7.30 am 9.53 am 11.58 am 4.58 pm Block B 7.35 am 9.58 am 12.03 pm 5.03 pm Time Arriving UTAR Block D 7.38 am 10.01 am 12.06 pm 5.06 pm Block......

Words: 2251 - Pages: 10

Schedule Importance

...Skills Corse Code: 9117 Log Journal Assignment: Topic # 1 Submitted to: Sir Yousuf Sharjeel “Change your life today. Do not gamble on the future, act now, without delay.” Life of a human is full of many tasks. He has to achieve all tasks on time. Since childhood, we are said to be on time otherwise teacher punishes us. When we enter in professional life, we are again said to be punctual this time life punishes us. Time schedule basically a plan for performing work or achieving an objective in allotted time. Most of people either professional or student face troubles to accomplish the work or project, If we all plan before start the work it will easier to achieve. Sometime many people, when task is given, think that it will be done, they put off until tomorrow what they can do today. They delay till last day come to the door. Actually and certainly this attitude kills the people. We learn many things if we work honestly without delay. Delay is nothing but the parents of failure. There are many things that make it difficult for people to schedule their time effectively. Some people have unclear objectives, some have burden of objectives, inability of objectives, stress objectives, and most having problem that work-work-work no other routine and some face interruptions. The people who are unclear about their objectives, it is very hard to accomplish work if you do not know where you are going, how can you expect to get there? Those people should first clear their......

Words: 643 - Pages: 3

Crash Schedule

...SCHEDULE CRASHING This project consisted in the implementation of software based on the needs of the recruiting force. The project was scheduled to be completed in two years, but due to a schedule crashing the project needs to completed nine months earlier. The estimated cost of the project was $278,000. The goal of this schedule crashing is to finish the project nine months earlier, but at the same time, we want to stay within the parameters in order to save money in resources. We will move personnel from a different area to train them in order for them to provide the required training on the implementation. At the end of the project due to the crashing schedule, we will like to provide the same training that it was scheduled at the beginning of the project. In addition, we would like to evaluate the knowledge of the recruiting station within the time scope. At the same time, we do not want to neglect the end state of the project. The following constraints will be taking into consideration: first, the budget available for the project. Second, time allowed for training new trainers. Third, having issues with connectivity and fourth, be able to finish the project within the time allowed by the schedule crashing. The new estimated budget due to the schedule crashing is $320,500 which is an increase of $42,500. As the project manager, I will have to make sure that I stay within the budget, but also be able to provide the training require in order for the system......

Words: 484 - Pages: 2

Schedule

...Schedule Narrative Project #3 12/3/2013 Introduction This schedule is being developed for a two story commercial building for Wentworth Institute of Technology. The project location is at Sweeny Field, Boston Massachusetts. The proposed building will be 2 stories high with a basement. The entire building will total 3636 square feet. It will be constructed out perimeter CMU wall using 8” x 16” CMU’s, concrete masonry face brick will be used as a veneer. The floors will be made out of 8” pre-stressed concrete slabs and open web joists will span the ceilings of the building. The NTP for this project will be issued on April 14, 2014. The start date will be the day after, Tuesday, April 15th. The contract required completion date is expected to be on Friday September 4th, 2015 giving the entire project a 17 month duration. Schedule Format A combined milestone and master schedule will be used for this project and Primavera P6 software’s will be used. The Project will consist of five phases: Preconstruction, Site work, Building, Mechanical - Electrical - Plumbing, Site Improvements, and Final Inspections and Closeout. The Holidays for this project will include Veterans Day, Thanksgiving Day, Christmas Day, Easter Day, Patriots Day, Memorial Day, and Independence Day. Submittals The Submittals are used as a tool for architects and engineers to verify that the correct materials and quantities are being installed. Therefore, submittal requirements will include product data,......

Words: 654 - Pages: 3

Schedule

...SCHEDULE PLEASE BE ADVISED SCHEDULE DUE TO CHANGE TO MEET THE NEED OF THE FACILITY PLEASE CLOCK IN PER YOUR SHIFT AND CLOCK OUT ON TIME PART TIME PEOPLE ARE NOT REQUIRED TO HAVE EVERY OTHER WEEKEND OFF ONLY FULL TIME EMPLOYEES C-COOKING A-AIDE ----------------------- |7/24 THUR |7/25 FRI |7/26 SAT |7/27 SUN |7/28 MON |7/29 TUE |7/30 WED |7/31 THUR |8/1 FRI |8/2 SAT |8/3 SUN |8/4 MON |8/5 TUES |8/6 WED | |Carolyn |6-1:00 |6-1:00 |OFF |OFF |6-1:00 |6-1:00 |6-1:00 |6-1:00 |6-1:00 |OFF |OFF |6-1:00 |6-1:00 |6-1:00 | |Andrea |OFF |6:30-2 |6-1:00 |6-1:00 |OFF |7-2:00 |6:30-2 |OFF |6:30-2 |R/O |R/O |6:30-2 |OFF |6:30-2 | |Elizabeth |OFF |4:30-8 |1-8:00 |1-8:00 |5-8:00 |OFF |4:30-8 |1:30-8 |4:30-8 |OFF |OFF |1:30-8 |4:30-8 |4:30-8 | |Stephanie |4:30-8 |1:30-8 |OFF |OFF |1:30-8 |1:30-2 |OFF |OFF |1:30-8 |1-8:00 |1-8:00 |OFF |5-8:00 |1:30-8 | |Charsha |1:30-8 |OFF |4-8:00 |4-8:00 |7-2:00 |OFF |1:30-8 |OFF |OFF |6-1:OO |6-1:00 |5-8:00 |1:30-8 |OFF | |Monique |6:30-2 |OFF |OFF |OFF |OFF |6:30-2 |OFF |6:30-2 |OFF |6-2:00 |6-2:00 |OFF |6:30-2 |OFF | |TROY |7-2:00 |OFF |6:30-2 |6:30-2 |6:30-2 |OFF |7-2:00 |7-2:00 |OFF |6:30-2 |6:30-2 |OFF |7-2:00 |7-2:00 | |MARIE |OFF |5-8:00 |4-8:00 |4-8:00 |0FF |4:30-8 |OFF |5-8:00 |OFF |4-8:00 |4-8:00 |4:30-8 |OFF |OFF | | TERRY |OFF |R/O |R/O |R/O |4:30-8 |5-8:00 |5-8:00 |OFF |5-8:00 |4-8:00 |4-8:00 |OFF |OFF |5-8:00 | |GENESIS |5-8:00 |7-2:00 |7-2:00 |7-2:00 |OFF |OFF |OFF |4:30-8 |7-2:00 |OFF |OFF |7-2:00......

Words: 412 - Pages: 2

Schedule

...Course Schedule Tuesday & Thursday Lecture # | Date | Topic | Chapter | CAS | Cases & Problems [1] | Hand In CasesDue 8:30 AM on the day of class | 1 | May 5 | Introduction to Auditing | 1 | 200 | | | 2 | May 7 | Auditor’s role & responsibilities | 2 | 200,300, 315 | | | 3 | May 12 | Professionalism & ethics | 3 (LO 1, 3-7) & Chap.18 (LO2) | | Half Empty * | | 4 | May 14 | Preliminary Audit PlanningI | 5 pg. (LO 1-5) | 300 | Ocean Mfg Inc.The questions to answer are available on Learn | Hand in to Drop Box Question 4 Answer should be approx. 1 page | 5 | May 19 | Preliminary Audit Planning II | 5 pg. (LO 6-8) | 300 | T DC 5-6 b & d onlyT 5-10 all | | 6 | May 21 | Assessing risk & Internal controls I | 6 pg.(LO 1-5) Appendix A&B | 330 | Apple Inc. | Hand in to Drop BoxQ 1 onlyAnswer should be max. 2 pages | 7 | May 26 | Assessing risk & Internal controls II | 6 pg. (LO 6-7) | | T DC 6-8 | | 8 | May 28 | Planning | | | Modern Tastings * | Hand in to Drop Box | | June 2 | Cancelled | | | | | 9 | June 3 | Review | | | Toy Factory | | MT # 1 | June 4 | Mid-term #1 | | | | | 10 | June 9 | Fraud risk assessment | 7 | 240, 250 | Laramie Wire | | 11 | June 11 | Audit Evidence | 8 | 230, 500, 520, 520 | Dog Ate my working papers * | Hand in to Drop Box | 12 | June 16 | Control Assessment & Testing I | 9 LO 1-5 | | Past exam question to be posted on learn | | 13 | June 18 |......

Words: 366 - Pages: 2

Schedule 3

...PROFIT AND LOSS OF A COMPANY GENERAL INSTRUCTIONS 1. Where compliance with the requirements of the Act including Accounting Standards as applicable to the companies require any change in treatment or disclosure including addition, amendment, substitution or deletion in the head or sub-head or any changes, inter se, in the financial statements or statements forming part thereof, the same shall be made and the requirements of this Schedule shall stand modified accordingly. 2. The disclosure requirements specified in this Schedule are in addition to and not in substitution of the disclosure requirements specified in the Accounting Standards prescribed under the Companies Act, 2013. Additional disclosures specified in the Accounting Standards shall be made in the notes to accounts or by way of additional statement unless required to be disclosed on the face of the Financial Statements. Similarly, all other disclosures as required by the Companies Act shall be made in the notes to accounts in addition to the requirements set out in this Schedule. 3. (i) Notes to accounts shall contain information in addition to that presented in the Financial Statements and shall provide where required (a) narrative descriptions or disaggregations of items recognised in those statements; and (b) information about items that do not qualify for recognition in those statements. (ii) Each item on the face of the Balance Sheet and Statement of Profit and Loss shall be......

Words: 481 - Pages: 2

Schedule

...markets. 8. Explain the principal theories of leadership and motivation, and describe the fundamental considerations in managing and motivating individual and group behavior. 9. Describe actions to improve communications, manage conflict, develop strong organizational culture, and improve the ethical behavior in organizations. 10. Analyze the role of the HRM function, and its importance to the management of employee and labor relations. 11. Describe control systems that can improve a firm’s operations and facilitate change. 12. Use technology and information resources to research issues in management concepts. 13. Write clearly and concisely about management concepts using proper writing mechanics. WEEKLY COURSE SCHEDULE The standard requirement for a 4.5 credit hour course is for students to spend 13.5 hours in weekly work. This includes preparation, activities, and evaluation regardless of delivery mode. Week | Preparation, Activities, and Evaluation | Points | 1 | Preparation * Reading(s) * Chapter 1: Management * Video(s) * “What is management?” found at http://www.lynda.com/Business-Skills-tutorials/What-management/142070/157271-4.html?org=strayer.eduActivities * Class Introductions * DiscussionEvaluation * Scavenger Hunt | 202010 | 2 | Preparation * Reading(s) * Chapter 2: History of Management * Chapter 3: Organizational Environments and Culture * Video(s) * “Understanding the importance of......

Words: 6711 - Pages: 27

Schedule

...Business Mathematics – Revision Schedule 1 2 3 4 22-Mar-16 23-Mar-16 24-Mar-16 25-Mar-16 5 26-Mar-16 6 7 8 9 10 11 12 13 27-Mar-16 28-Mar-16 29-Mar-16 30-Mar-16 31-Mar-16 1-Apr-16 2-Apr-16 3-Apr-16 14 4-Apr-16 15 5-Apr-16 16 6-Apr-16 17 7-Apr-16 18 8-Apr-16 19 9-Apr-16 20 10-Apr-16 21 11-Apr-16 22 12-Apr-16 23 13-Apr-16 24 14-Apr-16 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 15-Apr-16 16-Apr-16 17-Apr-16 18-Apr-16 19-Apr-16 20-Apr-16 21-Apr-16 22-Apr-16 23-Apr-16 24-Apr-16 25-Apr-16 26-Apr-16 27-Apr-16 28-Apr-16 29-Apr-16 30-Apr-16 Exercise # 1.1 Section-1 Full HOLIDAY Exercise # 1.1 Section-2 Section-1 Exercise # 1.2 Chap # 1 Exercise # 1.3 Section-2 Section-1 Section-2 Exercise # 1.4 Exercise # 1.5 Exercise # 1.6 Section-2 Exercise # 1.7 Section-1 Exercise # 2.1 Chap # 2 Section-2 Section-1 Exercise # 2.2 Section-2 Section-1 Exercise # 3.1 Section-2 Section-1 Chap # 3 Exercise # 3.2 Section-2 Section-1 Exercise # 3.4 Section-2 Section-1 Chap # 5 Exercise # 5.1 Section-2 Section-1 Chap # 6 Exercise # 6.1 Section-2 Question 1-4 Question 5-8 Full Question 1-6 Question 7-14 Full Full Full Full Question 1-5 Question 6-10 Full Full Question 1-5 Question 6-10 Full Question 1-4 Question 5-10 Full Question 1-6 Question......

Words: 365 - Pages: 2

Master Schedule

...THE MASTER SCHEDULE Any plan to schedule time and activities must have at its center a MASTER SCHEDULE, that is, a schedule of activities that is fixed. A master schedule needs to be drawn up only once a semester: unless, of course, changes occur in the basic program. First, fill in all the required activities, such as classes, drills, and laboratory periods. Second , add other regular activities, such as part-time jobs, commuting time, sports, and regular meetings. Third, include sleeping and eating. With the fixed activities accounted for, the remaining blank spaces on the uncluttered chart are free for use on a weekly or day-by-day basis. Such a schedule, on a 5x8 card, scotch-taped over your desk, or carried in your notebook, unclutters your mind, and more important, enables you to visualize the blank boxes as actual blocks of time into which you may fit necessary activities (see example below). With the MASTER SCHEDULE as your source, you may concoct any type of schedule that fits the uniqueness of your courses, your part-time or full-time job, or your personality. What matters most is that the schedule works for you. MON TUE WED THU FRI SAT SUN | | | | | | | | | |7-8 ......